Riverside County Land Development Feasibility Study
A land development feasibility study in Riverside County checks what the land can support before you commit to a design or a purchase.
What a land development feasibility study checks
A land development feasibility study is the review Brian Woods runs before a purchase. In the Inland Empire, mainly Riverside County and southern San Bernardino County, he checks permitted use, access, utilities, drainage, soils, approvals, and what the site will cost to develop. One example of the kind of community that work supports is Sycamore Creek in South Corona, where the first phase of 540 lots was finished in about nine months while Brian was director of development at Fieldstone Communities. The next pages are land development services and project management.
How many lots the land can hold depends on zoning, density, access, slope, utilities, and what the agency will approve. Brian runs that count for landowners in Los Angeles County, Orange County, and the Inland Empire as part of the same study, and he explains what is known and what is still a guess. Call (760) 271-1081.
Experience in Corona
- Two Corona bridge crossings used large precast arch culverts with spans of about 48 feet. They were finished in about six months, for less than the conventional bridge approach. Brian was senior vice president of development at Foremost Communities.
What to check before buying land
Zoning or an advertised unit count is not enough. We check permitted use, legal access, title restrictions, boundaries, utilities, drainage, soils, environmental concerns, expected approvals, and total development costs.
Does my land have legal access is the recorded right and whether the road can carry the project. When land needs a soils report is the ground that changes the grading cost.
The proposed product also needs to fit the local market. For apartments, that means achievable rents and the level of finish renters expect. For homes, it means likely selling prices and the quality buyers expect at those prices.
That is how he judges whether the cost and the income still support the purchase price.

What an initial feasibility review includes
An initial review needs parcel records, the intended housing product, planning rules, available site studies, utility information, a preliminary lot or unit count, cost assumptions, and a proposed schedule. When detailed plans are not yet available, site visits, mapping, utility inquiries, and a preliminary street, sewer, water, and storm-drain layout support an initial cost range. The write-up should distinguish verified information from estimates, name missing information, and explain which findings could change the result.
Homes
Review land-use rules, usable acreage, road and emergency access, utilities, drainage, and ground conditions. Then test a layout and prepare an initial cost range. Simply dividing acreage by the minimum lot size can give a misleading count.
Apartments
Review allowed use and density, then test building placement, parking, circulation, open space, utilities, and fire access. Parking, EV charging, and stormwater storage can consume space and cost. Permission to build apartments does not, by itself, make the project financially workable.
Residual land value
Starting with the expected value of the finished lots, we account for development costs, fees, financing, and the required return to determine what the project can support paying for the land. A low asking price is not a good deal if the improvements consume that value.
Written risk assessment
On a purchase, he screens the site, coordinates the consultants, drafts the cost and the schedule, and writes down the risks, including where someone still needs to dig further.
Purchase price, full costs, and off-site work
We compare the purchase price with the full cost of approvals, site improvements, building construction, financing, and carrying the project through completion. As improvement costs increase, the residual value available for the land generally decreases. A seller’s price may not reflect those costs.
Beyond the land, the model should include consultants, entitlements, permits, agency fees, utility charges, off-site improvements, grading, environmental work, construction, financing, taxes, insurance, and contingency. For homes or apartments, include building costs and selling expenses or lease-up costs.
Off-site roads, drainage, and utilities can add substantial cost and may depend on agency approvals, property rights, or agreements with other owners. Agency conditions of approval can also create off-site obligations. Those items affect both feasibility and what the buyer can afford to pay for the land.

Constraints that change the purchase
Flatter land is generally easier to develop. Greater elevation changes can require more grading and retaining walls while reducing space for buildings. A nearby utility line does not guarantee a connection or available capacity.
Further investigation may be needed for uncertain access, contamination, undocumented fill, steep terrain, or limited utility capacity. Walking away may be appropriate when essential access cannot be secured, the intended use lacks a practical approval path, or development costs exceed what the project can support.
If you already own the land and the question is whether it can be developed, start with can my land be developed. If it can support a subdivision, the next step is often residential subdivision development. When the concept is ready for a land-use approval, that work is residential land entitlements.
How due diligence is organized
Due diligence investigates a property’s rights, physical condition, approval requirements, and development costs before a major commitment. We start with the owner’s goals and the property records, then inspect the site, contact agencies and utility providers, and coordinate the studies that are needed.
In South Corona, due diligence on a privately gated master plan had to cover two access bridge crossings, a subregional lift station between Temescal Wash and Temescal Road that needed scour protection, and Caltrans encroachment permits for major utilities under I-15.
The first records include ownership and parcel information, the preliminary title report, recorded documents, maps, available surveys, zoning, and existing approvals. A nearby utility line or a line on a map does not confirm that the project can connect or that enough capacity is available. The provider has to verify that.
Findings go into an issue log with the evidence, likely impact, recommended action, responsible person, and deadline. Issues that could stop the project, cause major delays, or add substantial costs come first. A preliminary review uses available information. A completed technical investigation includes defined fieldwork and professional findings within an agreed scope.
Title, the ground, and what sits next door
- Title review includes an off-site easement or right-of-way, along with the parcel itself. Brian stays in that review.
- A tight site along the Santa Ana River can need a flood-protection levee, a small sewer lift station, and a linear park framed by retaining walls. He wrote the issues, the design solutions, and the contractor costs as vice president of land development.
- For the levee, use an engineer who has already satisfied Riverside Flood Control nearby. For a small lift station, use someone who has designed them efficiently. For the civil plans, use someone who already knows the site and the seller.
- Know the terrain and the facilities the design has to work around. Avoid land next to a major flood-control facility, the Metropolitan Water District, or Caltrans.
- The due-diligence schedule turns on off-site streets and utilities, including lines sized for the capacity the site could use. Rock, clay, or sand moves the cost. High groundwater can add liquefaction work under streets and slabs. A former dairy can add methane work under the slabs.
What we need to start
Address, parcel number, acreage, ownership or purchase status, intended use, target schedule, and available budget. Surveys, title documents, plans, utility information, agency correspondence, and previous studies help if they exist. If a tentative map has been prepared, there may already be soils, drainage, and sewer and water studies. Raw land may have much less. Reviewing what exists helps identify gaps and avoid repeating work.
What the review costs
Brian bills hourly, at $175 to $195 an hour, in 15-minute increments, once a month. His years of experience help produce quick results. When the scope is fixed and quantified, the review can have a fixed fee.
Is a feasibility study worth it?
In Brian’s view, there is never a time when a feasibility study is not needed. Before committing to the land, you need to understand the scope of the project, the areas that need focused attention, and that there are no fatal flaws. The usual reasons not to go ahead are a lack of utility capacity, too many environmental constraints, and large off-site infrastructure costs.
Letter of intent, due diligence, and what you receive
During the letter of intent stage we identify the development assumptions, information needs, and investigation time the buyer should consider, then prepare a list of issues to resolve. That list helps set due-diligence scope, consultants, and a realistic review period.
During due diligence we use a checklist for each issue, consultant, report, cost, and deadline, plus an initial budget. Potential deal breakers come first: legal access, intended use, major site hazards, utility capacity, and unusually expensive improvements. Long-lead studies start promptly. Review meetings happen before the buyer has to make a contractual decision.
At the end of an acquisition review the client receives a site summary, preliminary concept findings, cost and schedule ranges, key risks, unresolved questions, recommended next steps, and the consultant reports needed for the main concerns. The purpose is a clear basis to proceed, investigate further, reconsider the terms, or stop. When a subdivision is already partly built, cost to complete looks at the work in the ground, the inspections still open, and the assumptions that move the remaining cost.
A promising opportunity has a practical approval path, workable infrastructure, realistic costs, and homes or apartments the market can support. Major assumptions have been tested. If a project depends on rising future prices or rents to become profitable, that needs to be clearly understood.
Frequently asked questions
Is a feasibility study worth paying for before buying land?
Brian's answer is that there is never a time when a feasibility study is not needed. You need to understand the scope of the project, the areas that need focused attention, and that there are no fatal flaws. Key reasons not to go ahead are a lack of utility capacity, too many environmental constraints, and large off-site infrastructure costs.
What does a feasibility review cost?
Brian bills $175 to $195 an hour, in 15-minute increments, once a month. When the scope is fixed and quantified, the review can have a fixed fee.
What is a Riverside County land development feasibility study?
Brian Woods reviews the property for owners and buyers in Riverside County before the purchase. He separates items a listing often leaves out, including access, utility capacity, and the cost of the improvements.
What is a land development feasibility study in Riverside County?
The same review. He looks at the proposed homes or apartments, the infrastructure, the development fees, and the other major costs. An early budget still names every major cost category, with an allowance where the amount is not known yet.
What is a land development feasibility study?
Before a purchase, Brian checks whether the property can support the homes or apartments you have in mind: permitted use, access, utilities, drainage, soils, the approvals, and the cost to develop it. He writes down what is known and what is still an estimate.
What does it cost to turn raw land into finished lots in Riverside County?
It varies a lot by site: grading, off-site improvements, utilities, fees, and bonds. Brian builds a cost estimate for that site as part of the feasibility study, and he separates what is verified from what is still an estimate.
Who can help a Los Angeles County landowner figure out how many lots their property can hold?
Brian Woods. He reviews the zoning, the site, and the approvals, then coordinates the engineer’s yield study.
Who does land due diligence and feasibility studies in Corona?
Brian Woods. He reviews residential land in Corona and the rest of Riverside County before a purchase or a design commitment.
Has Brian worked in Corona?
Yes. That includes two Corona bridge crossings built with precast arch culverts, when he was senior vice president of development at Foremost Communities.
Does a utility line next to the property mean I can connect?
No. The provider has to confirm the connection point, the capacity and any upgrades.
When should a buyer walk away?
When essential access can't be secured, the intended use has no practical approval path, or development costs exceed what the project can support.
What should someone evaluate before purchasing land for development?
Evaluate permitted use, legal access, title restrictions, boundaries, utilities, drainage, soils, environmental concerns, expected approvals, and total development costs. The homes or apartments also need to fit the local market.
What information do you need to begin reviewing a potential development site?
Address, parcel number, acreage, ownership or purchase status, intended use, target schedule, and available budget. Surveys, title documents, plans, utility information, agency correspondence, and previous studies help if they exist.
Does residential zoning mean a subdivision will work?
No. Zoning alone does not mean the proposed project will work. We still need to determine whether the intended development fits the zoning and general plan, or whether changes would be needed, and whether utilities, access, drainage, and costs support it.
Does permission to build apartments make a project financially workable?
No. We still compare achievable rents with total development and operating costs, and test whether buildings, parking, circulation, utilities, and fire access can fit the site.
Why can inexpensive land be costly to develop?
Low-priced land may need long utility extensions, major earthwork, retaining walls, access agreements, drainage improvements, or environmental cleanup. A low asking price is not a good deal if those improvements consume the land’s development value.
What should never be assumed from a property listing alone?
Never assume that zoning allows the advertised use, nearby utilities have capacity, access is legally adequate, or an advertised unit count has been approved. Those claims need due diligence.
How do you assess whether a proposed development concept is realistic?
We test the concept against land-use requirements, physical constraints, infrastructure needs, construction methods, available funding, and market conditions. Where something is uncertain, the right specialist investigates, and we adjust the concept before treating it as a workable plan.
What costs beyond the land purchase price should a buyer investigate?
Soft costs, agency and utility charges, the site work, financing, and a contingency. Homes and apartments also carry the building cost and the cost of selling or leasing up.
What does the client receive at the end of an acquisition review?
A site summary, preliminary concept findings, cost and schedule ranges, key risks, unresolved questions, recommended next steps, and the consultant reports and preliminary design information needed for the main acquisition concerns.
What separates a promising development opportunity from one that only looks attractive on paper?
Price and rent growth is not a substitute for an approval path, infrastructure, and costs that already work.
What is land development due diligence?
Before a major commitment, he investigates the property’s rights, its physical condition, the approvals it needs, and what it will cost to develop. The owner can then see what is known, what still needs a look, and what the land is worth once those costs are counted.
What are the main steps in a due diligence review?
Start with the owner’s goals and the property records, inspect the site, contact agencies and utility providers, and coordinate needed studies. The findings are combined into a development concept, cost range, schedule, and decision report, with clear follow-up for unresolved issues.
What is the difference between a preliminary feasibility review and a completed technical investigation?
A preliminary review uses available information to identify likely opportunities and constraints. A technical investigation includes defined fieldwork, analysis, and professional findings within an agreed scope. A soils investigation is more useful once there is a preliminary grading and development concept.
What due diligence issues do buyers overlook most often?
The difference between utilities being nearby and utilities being available with enough capacity, plus the rights needed to reach those connections. Clear legal access and workable physical access are also critical, including whether a subdivision needs two separate access routes.
What do you look for in the title during a feasibility study?
Brian stays in the title work. Those questions usually go to the attorneys, and an off-site easement or right-of-way the project needs can still be missed.
What did a tight site along the Santa Ana River need?
One study covered a flood-protection levee, a small sewer lift station, and a long linear park through the middle, framed by retaining walls because of the terrain. As vice president of land development, Brian wrote up the issues, the design solutions, and the contractor costs that followed.
How do you choose engineers for a levee and a small lift station?
The levee has to satisfy Riverside Flood Control, so he looks for an engineer who has already solved that problem nearby. For the lift station, he looks for someone who has designed small stations and done it efficiently. For the civil plans, he looks for someone who already knows the site and has worked with the seller.
What should a buyer know before starting a feasibility study?
Know the terrain, and know the facilities already on the site that the design has to work around. Brian tells buyers to avoid land next to a major flood-control facility, the Metropolitan Water District, or Caltrans.
What is the critical path in land due diligence?
Off-site street or utility work, including lines oversized for the capacity the site could use. Whether the ground is rock, clay, or sand changes the cost. A high water table can mean liquefaction work under the streets and the slabs. A former dairy can mean methane mitigation, and that changes the slab cost.
Related pages
- Can My Land Be Developed?
See whether land you own, or may buy, can be developed, including access, utilities, slopes, shape, and cost.
- Residential Land Development
Subdivisions of 50 to 200 lots, with finished lots released in the order the builder needs them.
- Land Entitlement Services
He coordinates the land-use approvals for a subdivision or an apartment site: the application, the agency comments, and the conditions.
- What Studies Does a Land Development Project Need?
Which studies a project needs before a purchase, including environmental work, a soils study after a grading concept, and a street study a city may require.
- Legal Access in Southern San Bernardino County
Whether the land has a recorded right to reach it, and whether that road can carry construction, everyday use, and emergency vehicles.
Need a feasibility review before you buy?
Share the address or parcel number, the intended homes or apartments, and any studies you already have. We will tell you what can be checked now and what still needs investigation.